• Install the Pre-Installation Box in a fixed ceiling to
reserve space for the Descender Electrol.
• Prevent damage to the projection screen and the
screen casing. Install the Pre-Installation Box in the
ceiling during the rough-in stages of construction and
place the projection screen during the finishing stage.
• Mount the Pre-Installation Box using flexible mounting
points at the top of the box or from the sides.
• Once installed the flange on the case of the Descender
Electrol will completely cover the Pre-Installation Box.
Pre-Installation Box
Edges will be invisible
after installation
Install the ­projection
screen at a later stage.
Easy Installation during
the rough stages
Ceiling recessed projection screens
27
www.PROJECTASCREENS.COM • +31 (0) 495 580 840 • emea.sales
@
milestone.com
78
125
116
117
165
Screen Surface Assembly
Screen Case
2-Step Installation
1
+
2
=
Ready
• Order the screen case separate from the screen surface. Install the screen
case during the rough-in stages and the Screen Surface Assembly at a later
stage preventing any damage.
• The Screen Surface Assembly includes the bottom panel of the screen,
motor and screen surface.
• The steel cables of the Projecta Easy Serviceability System easily connect
the Screen Surface Assembly to the case ensuring a quick installation.
• Order the case first and decide the aspect ratio and screen surface at a
later stage ensuring optimal flexibility.